We will be pleased to help you
Your inquiry to us

Robert-Koch-Str. 9
D-77694 Kehl
Tel. +49 7851 9117-0
Fax +49 7851 9117-11
info@msg-kran.eu
www.msg-kran.eu

Your inquiry to us

*) Mandatory fields

Back to main page

 

Project

Blue Teams work best

Blue teams work best!

In the course of the renovation of the through road in Unterharmersbach, a steel bridge of the THW was lifted over the Harmersbach by us to divert traffic in the direction of Zell. With a length of 29 meters and a road width of 3.20 m, the bridge brought more than 60 tons on scale. The access roads and crane stands were challenging because of the narrow building development and demanded a very good planning.

No problem if you have the right devices and the best staff! Together with a super team of the THW, the Tandem Lift with our LTM 1300 and GMK 6400 ran smoothly and lasted only about 15 minutes. At this point we would like to thank the THW team for the good preparation and support!